QISP-led compliance for Industrial (IGP), Construction (CGP), and Municipal (MS4). We enroll permits,
write plans, run inspections and storm sampling, prepare submittals, and defend findings.
COMPLIANCE & PERMITTING
SMARTS NOI/NEC/NOT. Coverage Strategy. SIC Confirmation• NSD Evaluations. ERA Level 1/2 Investigation & Closure. QISPof-Record
PLANS & DESIGN
SWPPP & MIP Development. Drainage/Outfall Maps TMDL Appendix E. Plastic Pellet Programs. BMP Plans . Passive/Active Treatment
MONITORING & REPORTING
QSE Storm Sampling (≤4 hrs). Monthly Visual Observations Chain-of-Custody. ELAP Lab SMARTS Uploads. Annual Report (Jul 15) ERA Reports
ENFORCEMENT & TRAINING
NOV/NNC Response. Corrective Action Plans Regulator Meetings. Staff Training . Sampling & Spill SOPs
PERMITTING & RISK
PRD Package (Att. D.2). Risk Level (1/2/3) SMARTS Enrollment. 2009-2022 Transition (by 9/1/2025) Transfer/Termination
FIELD & MONITORING
QSD/QSP Services. QPE Monitoring. pH/Turbidity (Risk 2/3)• REAP Preparation. Photo Documentation. BMP Oversight
SPECIAL SYSTEMS & TMDLS
ATS Design (Att. F) Passive Treatment (Att. G). LUP (Att. E) Dewatering (Att. J) . TMDL Screening (Att. H). Enhanced BMPS
REPORTING & CLOSEOUT
SMARTS Inspection Logs. Annual Report (Sep 1). NOT Package. Post-Stabilization Verification
PROGRAM & CORE ELEMENTS
Phase I/II Support. SWMP Updates. Co-Permittee Coordination. Public Education IDDE. Construction/Post-Construction Good Housekeeping
TRASH & TMDLS
Track 1 Full Capture. Track 2 Implementation. O&M Protocols. WLA Translation. Reasonable Assurance Analysis. Watershed Plans
FIELD, DATA & REPORTING
Outfall Screening. Dry-Weather Flows. Hotspot Response. GIS Asset Inventory Annual MS4 Reports. SMARTS Effectiveness Assessment
Per Storm: QSE Sampling (IGP). QPE Inspections (CGP)
Monthly: IGP Visual Observations Construction Inspections
Annual: IGP Report (Jul 15) CGP Report (Sep 1) . MS4 Program Report
As-Needed: ERA L1/L2 Dewatering Notices NOV/CAP Packages